First feedback within 1 hour
Primary solution within 24 hours
Complaint to be solved within 48 hour
Engineer availability within 72 hours
Problem of equipment to be solved within 5 days
Installation and commissioning within 7 days
Ready for delivery within 3 months
*When an engineer must be dispatched
*When the required conditions are met
*After order and contract confirmation
Free site survey
Material inspection
Design
ROI analysis
Site Planning
Foundation Construction Guidance
Equipment installation guide
Original parts supply
Project renovation
From the initial consultation to program design, site visits, to the later stock delivery, after-sales complaint feedback, etc., Nanchang Mineral Systems has built a perfect system to effectively ensure the timely and rapid transmission of information to ensure that the right people are at the right time Provide more professional services and technical support of our company.